Chemical & Biological Engineering Building; Clean Energy Research Centre
The Chemical and Biological Engineering Building was one of three projects eligible for capital funding under the Province of BC’s Doubling the Opportunity (DTO) initiative to increase enrollment and graduates in the Engineering and Science disciplines. The 123,000 square foot building includes two integrated components; a replacement facility for the Chemistry and Biological Engineering Department (CHBE), which was spread over multiple locations on campus; and a new facility for the CFI funded Clean Energy Research Centre (CERC). This replacement facility for CHBE is a critical component for the continued success of the Chemical Engineering program.
- Address: 2360 East Mall
- User: Faculty of Applied Science
- Project Manager: Graeme Silvera
- Architect: Bunting Coady Architects & Diamond + Schmitt Architects
- Construction: Stuart Olson
- Project Size: 123,000
- Budget: 38,695,300
- Construction Status: Complete
- Completion: October 2005
- Occupancy: October 2005
- Sustainability Rating: LEED Silver (Equivalent)
- Awards: 2002 Vancouver Regional Construction Association